11/02/2007

The Residences on Water

The Residences on Water is beginning to rise out of the ground. The building utilizes a new development method, called the ER Post Structural System, that should allow for the pace of work to dramatically pickup in the coming weeks. This acceleration is possible because this method allows for all-weather erection, has fewer pieces and lets other trades begin work earlier in the process. The $20 million project is being developed by Fort Myers, FL based Development Opportunity Corporation. Once complete it will include a 128-room Staybridge Suites, 31 condo units, ranging in price from $234,000 to $2.3 million of which 8 have been sold so far, and 14,000 square feet of retail space.
I believe this project will have long lasting positive impacts on the Water St district. First it finishes the corner by removing a surface parking lot which adds to the urban fabric. Secondly the new activity created by the residents and hotel guests will continue to fuel neighborhood business. Further this project is clearly connected to Manpower's move to downtown and should support their business travel needs. Overall this is one of the most intriguing projects to watch considering the potential long term affects it will have on Water St. To follow this development I've started a flickr set, The Residences on Water, that I will update with new pictures to keep track of the progress. Articles
  • Ready to rise
  • Downtown Staybridge hotel, retail project to finally begin
  • New Precast Building Product from Spancrete Speeds On-site Construction Time
  • No comments: