Showing posts with label condominium. Show all posts
Showing posts with label condominium. Show all posts

12/17/2007

1530 North Jackson a Dingbat?

On the surface the 1530 North Jackson project seemed to be an appealing development because it was designed by the award winning Studio Dwell Architects out of Chicago and the project slightly improves the density in the neighborhood. Clearly attempting to fit a four story, six unit condominium project onto a small lot is a challenging effort and the design also needed to address neighborhood complaints about its density, style and potential parking problems. It appears the parking issue is managed by the design and the increase in density is very slight so the impact to the neighborhood should be minimized. Unfortunately the design looks to be a new spin on the Dingbat style all be it with parking along the side. The failure of this design isn't in the quality of materials, slope of the roof, lack of parking, or density, the failure is that it doesn't properly address the street. For the most part this design turns its back on the street, with much of the building facing the street being solid walls. It's possible the design images don't do the project justice and maybe the windows shown will do enough to connect the building to the street but clearly Studio Dwell Architects can do better. You can follow this development through the a flickr set, 1530 North Jackson that will be updated with new pictures to keep track its progress. Articles + Reference Blair Williams branches out 070593

11/20/2007

CatalystMilwaukee.com

In recent weeks Ghazi Co. has been building momentum for the Catalyst. They announced Big City Lanes as the first secured tenant. Afshin Ghazi spoke at the fifth annual Small Business Times Commercial Real Estate and Development Conference promoting both Catalyst and a return to the city. And today Catalyst took yet another positive step forward with the launch of CatalystMilwaukee.com. Hopefully this momentum is truly sustainable, so that one day the surface parking lot at 4th & Wisconsin will be Milwaukee's newest entertainment district.

11/02/2007

The Residences on Water

The Residences on Water is beginning to rise out of the ground. The building utilizes a new development method, called the ER Post Structural System, that should allow for the pace of work to dramatically pickup in the coming weeks. This acceleration is possible because this method allows for all-weather erection, has fewer pieces and lets other trades begin work earlier in the process. The $20 million project is being developed by Fort Myers, FL based Development Opportunity Corporation. Once complete it will include a 128-room Staybridge Suites, 31 condo units, ranging in price from $234,000 to $2.3 million of which 8 have been sold so far, and 14,000 square feet of retail space.
I believe this project will have long lasting positive impacts on the Water St district. First it finishes the corner by removing a surface parking lot which adds to the urban fabric. Secondly the new activity created by the residents and hotel guests will continue to fuel neighborhood business. Further this project is clearly connected to Manpower's move to downtown and should support their business travel needs. Overall this is one of the most intriguing projects to watch considering the potential long term affects it will have on Water St. To follow this development I've started a flickr set, The Residences on Water, that I will update with new pictures to keep track of the progress. Articles
  • Ready to rise
  • Downtown Staybridge hotel, retail project to finally begin
  • New Precast Building Product from Spancrete Speeds On-site Construction Time
  • 10/30/2007

    Sidney Hih Project Moves Forward

    The controversial Sidney Hih project , that last summer was turned down for city financing of a TIF, appears to moving forward again. The first indications were the signing of multiple tenants to the project as recently reported in the Bizjournal article "Ruvin recruits Park East tenants". The second significant step forward occurred this morning when the Public Works Committee approved a resolution agreeing to a long term lease with Ruvin Development Inc. of the city's parking garage at 4th and Highland. This is important because Ruvin Development Inc.'s attempts to receive a TIF district revolved around the project's perceived parking needs, so this agreement should allow Ruvin Development Inc. to move forward with the project. Additionally this will create a new revenue stream for the City of Milwaukee and better utilizes a city owned parking structure. I believe these two recent developments are very encouraging signs and that the Sidney Hih project may soon get underway.
    To follow this development I've started a flickr set, Sidney Hih that I will update with new pictures to keep track of the progress. Please note currently there's just one photo as no construction has begun.
    Articles Ruvin recruits Park East tenants Plans on tap to rejuvenate Gipfel Brewery Billion-dollar building boom Gatehouse Capital and Ruvin Development select Kimpton for Milwaukee boutique hotel opening late 2009

    10/24/2007

    Park Lafayette

    Park Lafayette is the first project for developer Warren Barr, of Renaissant Development Group LLC, in Milwaukee and it is worth stopping in the sales center to see the level of quality he delivers. Not only can your tour the two bedroom model but you can also check the view from every unit in the building. The project itself has approximately 292 households per acre which should only add to the Eastside's already buzzing vibrancy. And although not affordable units per se the majority of the units in the building start in the 200's allowing for a wider range of buyers to enter the market than many of the other developments in Milwaukee currently. To follow this development I've started a flickr set, Park Lafayette that I will update with new pictures to keep track of the progress. Articles Condo towers win funds The high-rise guy City of Milwaukee Department of City Development Documentation Detailed Planned Development:Renaissant’s Park Lafayette

    9/26/2007

    BreakWater development

    Despite minor community concern over the height of the building and DCD's concerns over the balconies, the BreakWater condominium tower has begun demolition of the former Christopher East Medical Center building. The tower is planned to be 20 stories with 101 units and is the latest in what has become an ongoing trend of lakefront development in Milwaukee. To follow this development I've started a flickr set, BreakWater Development, that I will update with new pictures to keep track of the progress. Articles BreakWater to break ground. East side condo tower proposed